Brenner Base tunnel on Italian side over 95% complete after breakthrough
- Geo Con
.png/v1/fill/w_320,h_320/file.jpg)
- May 7
- 1 min read
The main section of the Brenner Base tunnel on the Italian side is now 95% completed after a tunnel boring machine (TBM) finished a tricky drive beneath the Alps.










Comments