Tunnelling set to resume on stalled Snowy 2.0 hydro project
- Geo Con
- Aug 3, 2023
- 1 min read
Updated: Aug 4, 2023
A tunnel boring machine (TBM) that was paused last year after it encountered soft ground is due to resume tunnelling on the Snowy 2.0 hydro scheme in New South Wales, Australia.
Comments