Future ground challenges ‘cannot be ruled out’ for £6bn Snowy Hydro 2.0
- Geo Con
- Sep 8, 2023
- 1 min read
A geotechnical report has said that future tunnelling operations on Australia’s troubled Snowy 2.0 hydro scheme could be hit by “additional faults and poor ground conditions”, as the cost of the project climbs to £6bn (A$12bn). Click here for full article
Comments